Direct materials variance is calculated as the difference between actual cost and standard cost. If actual cost is $150,000 and standard cost is $152,000, what is the variance?

Master accounting concepts with the Accounting SmartBook Test. Engage with interactive questions and comprehensive explanations. Excel in your accounting exams!

Multiple Choice

Direct materials variance is calculated as the difference between actual cost and standard cost. If actual cost is $150,000 and standard cost is $152,000, what is the variance?

Explanation:
Direct materials variance is found by subtracting the standard cost from the actual cost. Here, 150,000 − 152,000 = −2,000. A negative result means actual costs were lower than planned, which is favorable. So the variance is a $2,000 favorable difference.

Direct materials variance is found by subtracting the standard cost from the actual cost. Here, 150,000 − 152,000 = −2,000. A negative result means actual costs were lower than planned, which is favorable. So the variance is a $2,000 favorable difference.